中文
English
繁体

Tianjin Urban Construction Group Building Materials Solid Waste Treatment Solution

longhe
2023-04-08
Source:Original

A — Basic information of the case

Project Name:Solid Waste Treatment Solution for Building Materials

Customer Name:Tianjin Urban Construction Group

Project location:Tianjin City

Project start time:2010


B — Project Background and Requirements

Tianjin Urban Construction Group focuses on road and bridge construction, infrastructure and housing construction. During the construction process, a large amount of solid waste of building materials will be generated, which is not only bulky and difficult to store and transfer, but also has various sizes and types. Random disposal can easily have a significant impact on the construction environment and surrounding environment, and does not comply with the concept of "green development road" advocated in China. So can these building material waste be turned into treasure? Longhe solved this problems for customers.


C — Solutions and Effects

In response to customers' needs for equipment that can be used in complex construction site environments, is easy to move, and can efficiently handle various types of building material solid waste, we provide customers with a complete set of building material solid waste treatment solutions, including a dual axis crusher, a multi-functional movable crusher, and conveyor packaging.


天津城建01.jpg


In this scheme, the double shaft crusher is used for wood, steel, foam, film, engineering plastic parts, etc., and then sent to the designated place for compression and packaging through the loader after being refined by the multi-functional shredder; The multifunctional crusher can be moved to a designated place for on-site processing without the need for secondary storage. The entire process not only improves the efficiency of waste disposal, but also greatly reduces the impact on the construction environment. The packaged waste will be classified and sent for recycling and reuse.


D — Customer Acceptance

Machine usage and evaluation:


Installation and use:



Longhe engineers provide on-site guidance and pass the quality inspection


Personnel training:


Teach and train two engineers for the customers



Use Evaluation

Crushing status test:

√ Passed

discharge speed test:

√ Passed

Energy consumption noise test:

√ Passed

Passed dust pollution test:

√ Easy

Suitable for crushing building material waste:

30 types

There are dozens of comprehensive evaluation indicators in total, only 5 of which are listed above


②   After sales and other cooperation:


Longhe has been a professional after-sales service provider for Tianjin Urban Construction Group for 12 years, and both parties have been satisfied to this day. Provide equipment for multiple construction sites during the period.



E — Project Summary

We have always been committed to providing customers with personalized construction solid waste treatment solutions, tailored to local conditions. In the field of waste recycling and treatment, we have also been deeply rooted for many years. In terms of equipment quality and after-sales service, we have received praise from many customers and are the best choice for purchasing multi-functional shredders!

Read11
share
Next:This is the last one
Prev:This is the first article
Write a Review...